-1,預(yù)鍛尺寸985/610/475 mm,模具溫度280 ℃)。各參數(shù)對(duì)模擬結(jié)果的重要性順序如下:變形溫度>應(yīng)變速率>坯料形狀>>模具溫度。使用最佳參數(shù)組合獲得的實(shí)驗(yàn)結(jié)果與數(shù)值模擬結(jié)果吻合較好,表明該方法可以避免大量實(shí)驗(yàn)和數(shù)值模擬工作量,有效地控制超大型鍛件的載荷和微觀組織。;The forging load of super large turbine disc with a diameter over 2 m may approach or even surpass the limit of 800 MN of the largest press machine in China, which is the extreme manufacturing. Thus, maintaining good mechanical properties and controlling forging load are two key factors during the forging process of super large turbine disc. 25 groups of forging parameters was designed based on Taguchi method. The multi-objective optimization of finite element method simulation results was conducted by SNR and ANOVA methods. Results show that the most uniform and refined recrystallization microstructures are obtained under optimal forging load. The optimal combination of process parameters is determined under extreme manufacturing condition: temperature=1120 °C, strain rate=0.06 s-1, pre-forging size=985/610/475 mm, and die temperature=280 °C. The order of importance of each parameter to the simulation results is as follows: temperature>strain rate>billet shape>>die temperature. The experimental results obtained under the optimal parameters combination show good agreement with the simulated results, which demonstrates that this approach may be used to manage the load and microstructure of super large forgings while avoiding a significant number of experiments and numerical simulations."/>

最新色国产精品精品视频,中文字幕日韩一区二区不卡,亚洲有码转帖,夜夜躁日日躁狠狠久久av,中国凸偷窥xxxx自由视频

+Advanced Search
網(wǎng)刊加載中。。。

使用Chrome瀏覽器效果最佳,繼續(xù)瀏覽,你可能不會(huì)看到最佳的展示效果,

確定繼續(xù)瀏覽么?

復(fù)制成功,請(qǐng)?jiān)谄渌麨g覽器進(jìn)行閱讀